Sr.No. |
Nature of Services Provided |
Project |
1 |
Conceptual Study |
Oil and Gas Separation Station |
2 |
Cost estimation |
Handling and packaging systems for Ethylene Amines |
3 |
Cost Estimation |
Piperazine plant. |
4 |
Cost Estimation |
Chalk disposal (Brick Plant). |
5 |
Cost Estimation & Feasibility Study |
Piperazine purification plant and expansion of Amines separation section. |
6 |
Cost Estimation & Feasibility Study |
LPG Recovery Plant |
7 |
Cost Estimation & Feasibility Study |
7.5 MW Co-generation Plant. |
8 |
Cost Estimation & Feasibility Report |
C 5 Separation |
9 |
Cost Estimation & Feasibility study |
CO 2 Chiller |
10 |
Cost Estimation & Feasibility study |
Syngas Chiller |
11 |
Cost Estimation & Feasibility Study |
Recovery of waste ammonia as ammonium sulfate. |
12 |
Cost Estimation & Feasibility Study |
Solvent plant. |
13 |
Cost Estimation & Feasibility Study |
Power generation from wind energy. |
14 |
Cost Estimation & Feasibility Study |
500 TPA Pesticides Intermediate Plant. |
15 |
Feasibility Study |
LPG Recovery Plant |
16 |
Market Research |
Natural Gas consumption in South Gujarat |
17 |
Prefeasibility Study |
Condensate based Refinery |
18 |
Preliminary Basic Eng. For Cost Estimation |
V Plant Synthetic Rutile |
19 |
Project & Product Cost Estimation |
Monochloro Acetic Acid Plant |
20 |
Project & Product cost Estimation |
Precipitated Calcium Carbonate Plant |
21 |
Project Cost Estimation |
Molecular Sieve System |
22 |
Project Cost Estimation |
Solid Calcium Chloride |
23 |
Technology Search & Cost Estimation |
6,000 TPA Glycol Ethers plant. |
24 |
Cost Estimation & Feasibility Study |
10,000 TPA Ethylene Amines Plant |
25 |
Cost estimate & feasibility study |
5000 TPA zinc oxide plant |